ERROR on my switch 3750, here the message on booting:
Waiting for Stack Master Election…
POST: Inline Power Controller Tests : Begin
POST: Found inline power controller write failure, inst 11
POST: Inline Power Controller Tests : End, Status Failed
POST: Inline Power feature is disabled on this switch
POST: PortASIC CAM Subsystem Tests : Begin
POST: PortASIC CAM Subsystem Tests : End, Status Passed
POST: PortASIC Port Loopback Tests : Begin
POST: PortASIC Port Loopback Tests : End, Status Passed
Election Complete
Switch 1 booting as Master
Waiting for Port download…Complete
————–
I use 3750 for 16 PCs and 12 IP Phone 7960G. PC client still work but I can’t use or activate PoE on my IP Phone anymore. I try to give command = “power inline consumption <miliwatts range 4000 – 15400>” but still failed.
does anyone know whats the problem??
update:
the answer here on sadikhov forum..